India

PM Modi To Attend 2 Day ‘Global Investors Summit’ In Dehradun On December 8

DEHRADUN: Chief Minister Pushkar Singh Dhami asked Prime Minister Narendra Modi to attend the two-day Global Investors Summit in Dehradun, which begins on December 8, during their meeting on Saturday in Delhi. He also talked about the rescue from the Silkyara tunnel, and the CM showed him some pictures from the evacuation mission.

The CM discussed various issues related to the state and expressed gratitude for including the Jamrani Dam Project in the Pradhan Mantri Krishi Sinchai Yojana and approving Rs 1,730 crore for the project.

Song Dam Drinking Water Project

He requested clearance for the capital expenditure of the Song Dam Drinking Water Project in the amount of Rs 2,460 crore and the special financial assistance of Rs 3,000 crore for the upgrade of Jolly Grant Airport.

In addition, he proposed the establishment of the All India Ayurveda Institute on the campus of Rishikul Ayurvedic College in Haridwar and asked for Uttarakhand to be included in the Kiwi Feasibility Study, which is being conducted in cooperation with New Zealand. Dhami asked for the Ranikhet-Bhatrojkhan road to be designated as a national highway and requested approval for a number of road improvements totaling Rs 1,000 crore.

Tanakpur Bageshwar Railway Project discussed in meeting

Dhami requested that Modi approve the construction of the Tanakpur-Bageshwar Railway Project as a national project, as well as the tunnel projects in Kumaon: Jolingkong-Bedang (5 km), Sipu-Tola (22 km), and Milam-Lapthal (30 km). In addition, he requested approval for the development and construction of eleven uncontested projects with a combined capacity of 771 MW in Alaknanda, Bhagirathi, and its tributaries, as well as numerous projected hydropower projects on the Dhauliganga and Gauri Ganga rivers in Pithoragarh district.

Also Read: 10 BJP MP’s resign from Lok Sabha after winning state elections

Silkyara tunnel project to be restored

The Silkyara tunnel project will be restored after 4-6 months, according to the NHIDCL; mechanical debris removal and crown cavity repair are scheduled; construction and investigation will happen simultaneously; the ministry will determine who is responsible for what and work to prevent similar incidents in the future; and the borehole will be filled after vertical drilling.

Concerns regarding the possible sinking of the Radi mountain are being raised by the Silkyara tunnel project and the current rescue attempt. Overuse of machinery, such as chopping trees and upsetting aquifers, is regarded as a serious environmental hazard. Three of the mountain’s sides have already started excavation, however environmentalists stress that because of the mountain’s porous structure and numerous water sources, caution must be used when handling the excavation. If excavation continues without taking environmental considerations into account, springs may dry up and the geophysics of the area may be greatly affected.

Srishti Verma

Recent Posts

Delhi-NCR’s Air Quality Remains Hazardously Poor; AQI Hits 409

Delhi-NCR’s air quality continued to remain dangerously poor for the third straight day, with the…

46 minutes ago

Telangana Issues Warning To Diljit Dosanjh Ahead Of ‘Dil-Luminati’ Concert

The Telangana govt has issued a notice to Punjabi singer Diljit Dosanjh, instructing him not…

1 hour ago

Truck Drivers In Delhi Express Concerns Over Impact Of Graded Response Action Plan (GRAP-III)

The CAQM enforced Stage-III of the GRAP starting Friday, 15 November, as air quality in…

2 hours ago

PM Modi Engages With Religious Leaders; Highlights Education & Social Initiatives In Chhatrapati Sambhajinagar

On Thursday, PM Narendra Modi visited Chhatrapati Sambhajinagar, where he met with notable religious figures…

2 hours ago

UPPSC Announces Single-Day PCS (Preliminary) Exam After CM Yogi’s Intervention

In response to demands from competitive exam candidates, the UPPSC announced a major decision to…

12 hours ago

UPPSC Announces Key Changes To Exam Schedule; PCS Prelims Unchanged, RO/ARO Exams Delayed

 Addressing the concerns of exam aspirants, the UPPSC announced a major change in its examination…

13 hours ago