India

UP Government Allocates ₹20 Crore For Mahakumbh 2025 River Expansion

In preparation for the anticipated influx of devotees for Mahakumbh 2025, the Uttar Pradesh government has launched efforts for river expansion along the banks of the Sangam. Moreover, to achieve the channelization of river and dredging at Sangam Nose, govt is planning to allocate around ₹20 crore.

The Irrigation and Water Resources Department is fully prepared. The department has has already received in-principle approval from the government. This initiative comes in response to significant erosion, which has reduced available land along the Sangam by 60% since 2019.

Between 2019 and 2024, the Ganga River has shifted approximately 200 to 500 meters from its right bank, significantly decreasing the land area. To address this issue, the Mela Administration, along with the Irrigation and Water Resources Department, is taking action for river expansion based on recommendations from experts at IIT Guwahati.

Also Read: UP Govt Unveils Advanced Water Management System For Maha Kumbh 2025

To increase the circulation area from Shastri Bridge to Sangam Nose, several measures have been proposed. The Irrigation Department plans to expand channelization work from approximately 150 meters to 175 meters using dredging machines.

The work of Mechanical Division will include handling of the dredging, embankment and enlargement of the circulation area will utilize the extracted material. This particular segment of project will need approximately ₹6.34 crore.

Additionally, launching apron (1×8 meters) will be constructed using geo bags within a nylon crate. The embankment layer will incorporate geo-grid materials rated at 200 and 100 MT per square meter. Notably, The management will spend around 10.24 crore rupees on this segment of the project.

The government has directed the Irrigation Department to draft a proposal and submit it to the Department of Urban Development. The Department of Urban Development will be responsible for ensuring further action on the project.

Vishal Talwar

Recent Posts

Delhi AQI Remains In ‘Poor’ Category As Winter Chill Intensifies

Delhi recorded an AQI of 279 as winter chill intensified, with the IMD forecasting dense…

31 mins ago

President Murmu To Visit Mizoram, Nagaland; Attend Varsity Convocation; Hornbill Festival

President Droupadi Murmu will visit Mizoram and Nagaland, attending a university convocation, visiting a tribal…

2 hours ago

‘His Immortal Ideas Will Forever Guide Society’: CM Yogi Pays Tribute To Mahatma Jyotiba Phule

CM Yogi Adityanath paid tribute to Mahatma Jyotiba Phule, recalling his enduring contributions to social…

2 hours ago

Lieutenant Governor Dr Dinesh Sharma Inaugurates ‘Gyanodaya’ Science Exhibition, Inspires Students To Dream Big

Andaman and Nicobar Lieutenant Governor Dr Dinesh Sharma inaugurated the Gyanodaya 2026-27 science exhibition.

12 hours ago

Lieutenant Governor Dr Dinesh Sharma Inaugurates Redeveloped Joggers Park In Sri Vijaya Puram

Andaman and Nicobar Lieutenant Governor Dr Dinesh Sharma inaugurated the redeveloped Joggers Park under the…

12 hours ago

Andaman LG Dr Dinesh Sharma Pushes Dairy Self-Reliance, Employment And Cattle Development

Andaman and Nicobar Lieutenant Governor Dr Dinesh Sharma inaugurated a modern fodder farm on National…

12 hours ago